Skip to content
  • About
    • Company Profile
    • Board of Directors
    • Corporate Governance
    • Corporate Directory
  • Projects
    • Greenvale
      • Steam Engine
      • Bottletree
      • Lynd/Dido
      • Galah Dam
      • Cockie Creek
      • Wyandotte Copper
      • Halls Reward
      • One Mile/One Mile Dam
      • Riesling
      • Lucky Creek
    • Nicholson
      • Nicholson Project
      • Walford Creek West
      • Hedleys Uranium
    • Victor
      • Victor
  • Investors
    • ASX Announcements
    • Shareholder Information
    • Reports
    • Technical Reports
    • Presentations
  • Media
    • Media Coverage
    • Image Library
  • Contact
Menu
  • About
    • Company Profile
    • Board of Directors
    • Corporate Governance
    • Corporate Directory
  • Projects
    • Greenvale
      • Steam Engine
      • Bottletree
      • Lynd/Dido
      • Galah Dam
      • Cockie Creek
      • Wyandotte Copper
      • Halls Reward
      • One Mile/One Mile Dam
      • Riesling
      • Lucky Creek
    • Nicholson
      • Nicholson Project
      • Walford Creek West
      • Hedleys Uranium
    • Victor
      • Victor
  • Investors
    • ASX Announcements
    • Shareholder Information
    • Reports
    • Technical Reports
    • Presentations
  • Media
    • Media Coverage
    • Image Library
  • Contact

Quarterly Activities/Appendix 5B Cash Flow Report

  • January 31, 2025

SUMMARY

Steam Engine Gold Project

• A Scoping Study on the viability of a toll treatment as well as a standalone processing operation was completed and reported during the previous Quarter. The study indicated robust economics and identified significant scalability upsides in the event that modest additional tonnages of open-pittable Resources are identified by further drilling.

• A Feasibility Study based on a toll treatment operation progressed during the reporting period.

• Results from the first batch of samples from Phase 2 of the 2024 Resource expansion and exploration drilling program were reported during the period.

• New zones of gold mineralisation were identified at the northern ends of the Steam Engine and Eastern Ridge lodes.

• Advanced 3D modelling of SAM geophysical data indicated that highly anomalous features resembling previously unknown gold lodes, including a potential extension of the main Steam Engine Lode, are real features and are likely to be at shallow depth.

Bottletree Copper Prospect

• The Company was awarded a $300,000 Collaborative Exploration Initiative (CEI) critical minerals grant for the drilling of two deep holes targeting a modelled porphyry core during the 2024 field season. The government has extended the timeframes for completion of the CEI drilling.

• Drilling of the CEI holes is planned for commencement within the following two months, subject to weather conditions.

Cockie Creek Porphyry Cu-Au-Mo Prospect

• Modelling of a maiden JORC (2012) Mineral Resource Estimate is nearing completion and on track for release to the market during the first quarter of 2025.

Hall’s Reward High Grade Cu-Au-Ag Prospect

• New (to the market) high grade copper-gold-silver project located within the Greenvale Project.

• Historical small-scale mining between 1933-1957 over a strike length of 50m and to a maximum depth of 45m produced 12,800t @ 5 g/t Au, 17% Cu and 23 g/t Ag.

• Drill program being planned to test for mineralisation around the old workings and also a second lode that extends up to 2kms strike length.

Read the announcement via this link

PrevPreviousFirst assays further define high grade Au shoot at Eastern Ridge Lode with ground-breaking implications for Steam Engine Lode
NextHalls Reward – Greenvale data review reveals high-grade Cu-Au-Ag targetsNext

About Us

Superior Resources offers entry-level ASX exposure to world-class exploration projects.

Read More
View the latest share price:
ASX: SPQ

Keep Informed

Stay up to date with the latest news from Superior Resources by joining our mailing list.

Quick links

  • Home
  • About
  • Projects
  • Investors
  • Contact Us

Newsletter

Stay up to date on the latest Superior Resources Announcements and other news.

Find Us

Unit 8, 61 Holdsworth Street,
Coorparoo, Qld 4151
PO Box 189
Coorparoo, Qld 4151

Contact Us

P: +61 7 3847 2887 E: manager@superiorresources.com.au
Linkedin-in Facebook-f Twitter
  • © 2021 Superior Resources Limited - All Rights Reserved
  • Privacy Policy
  • Disclaimer
  • Website By Chilli